Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Loading and unloading synchronous device for
automatic assembly machine for binder clips
XIONG Sichang, QIAN Zhongjie
(School of Mechanical Engineering, Zhejiang University of Technology, Hangzhou 310000, China)
Abstract: Aiming at the problem of the defect and inefficient of the binder clips automated assembly system assembly loading and unloading process, a new loading and unloading synchronization device which was twostage intermittent push plate was proposed. This synchronization device was used to realize the function of unassembled clip body loading and assembled binder clip unloading. Using the Siemens S7200 series PLC controller to roundly control loading and unloading device, transport device and assembly device, the automatic assembly machine were implemented. Based on the loading and unloading cylinder dynamics simulation with the Simulink simulation tool of Matlab, each parameter value in the process of pneumatic launch was determined, and the optimal value of working pressure and the platform assembly efficiency were worked out. The experimental results indicate that the loading and unloading synchronization device has highest work efficiency and the lower fault rate,which can effectively replace manual loading unloading,while the cylinder pressure is 0.2MPa and the loading and unloading time is 0.693s.
Key words: binder clips; automatic assembly; loading; unloading; cylinder; dynamics simulation