Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
LIU Yujuan1, YI Pengxing1, HU Jiukun2, LUO Luqin2
(1.School of Mechanical Science&Engineering,Huazhong University of Science&Technology,Wuhan 430070,China; 2.Dongjiang Environmental Company Limited,Shenzhen 518057, China)
Abstract: Aiming at the problem that recycling ball steering machine is difficult to plan disassembly sequence,a planning method combining the network graph of disassembly and the improved Floyd algorithm was proposed.The assignment matrix was obtained by establishing the network graph of disassembly and calculating the demolition time based on the method time measurement (MTM).After comparing the computational efficiency and the applicable range of two existing improved Floyd algorithms, a new algorithm was improved,the complexity of which was greatly reduced.Finally, the improved Floyd algorithm was used to simulate in Matlab. The results indicate that the efficiency of calculation is improved by using the improved Floyd algorithm, and it is more practical to obtain the optimal disassembly sequence of the steering machine for complete dismantling.
Key words: disassembly sequence planning; method time measurement (MTM); the improved Floyd algorithm