International Standard Serial Number:

ISSN 1001-4551

Sponsor:

Zhejiang University;

Zhejiang Machinery and Electrical Group

Edited by:

Editorial of Journal of Mechanical & Electrical Engineering

Chief Editor:

ZHAO Qun

Vice Chief Editor:

TANG ren-zhong,

LUO Xiang-yang

Tel:

86-571-87041360,87239525

Fax:

86-571-87239571

Add:

No.9 Gaoguannong,Daxue Road,Hangzhou,China

P.C:

310009

E-mail:

meem_contribute@163.com

Implementation of embedding C language programming in PLC ladder diagram
Published:2012-07-09 author:HUANG Xiao-qiang,YAN Yi,WU Hui-feng,WU Pan-pan Browse: 4070 Check PDF documents

Implementation of embedding C language programming in PLC ladder diagram

HUANG Xiao-qiang,YAN Yi,WU Hui-feng,WU Pan-pan
(College of Computer, Hangzhou Dianzi University, Hangzhou 310018, China)

Abstract: Aiming that the ladder diagram(LD)  language is incompetent in realizing complex algorithms,a mix programming method of ladder diagram and C language was proposed. The component technology for ladder diagram implementation was analyzed and the way to embed C language inside ladder diagram was introduced. Experiments were carried out based on the computer assist special system(CASS) platform. Results show that the proposed method is fit for complex algorithm implementation,and the code size could also be reduced.
Key words: ladder diagram(LD) ;C language;mixed programming;computer assist special system(CASS)
 

  • Chinese Core Periodicals
  • Chinese Sci-tech Core Periodicals
  • SA, INSPEC Indexed
  • CSA: T Indexed
  • UPD:Indexed


2010 Zhejiang Information Institute of Mechinery Industry

Technical Support:Hangzhou Bory science and technology

You are 1895221 visit this site