Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Research on construction modelbased disassembly squencing
YU Yuanzheng,LOU Yuehai
(School of Mechanical Engineering, Zhejiang Institute of Mechanical and Electrical Engineering,Hangzhou 310053, China)
Abstract: In order to solve the problem of data explosion during disassembly sequencing for products that have complex structure,disassembly features of typical mechanical components were analyzed, valid intersections of freedom of a part were regarded as its possible disassembly directions Applying the principle of constraint eliminating, disassembly sequencing was realized by heuristic algorithms To further improve computation efficiency and practicability of the disassembly sequence, a hierarchical construction model was introduced to downgrade assembly depth of a product By means of structural decomposing, computation reduction was realized since that was unnecessary to determine the disassembly sequence for any single part of the entire product The disassembly sequencing procedure was illustrated by a vehicle model The result indicates that the amount of computation during disassembly sequencing is significantly reduced by the hierarchical construction modelbased constraint eliminating, and therefore data explosion for complex products is controlled
Key words: disassembly sequencing; constraint eliminating; construction model; design for disassembly(DFD)