Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Investigation of optimal PMU placement considering limited number of channels constraints and critical line constraints
FAN Hai-feng1, XV Kai1, JIANG Quan-yuan1, SONG Jun-ying2,CHEN Yue-hui2, ZHANG Wen-lei2
(1. College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China; 2. Hunan Electric Power Company, Changsha 410007,China)
Abstract: Aiming at the problem of the constraints involved in the configuration of phasor measurement unit (PMU) in the previous work failing to meet the engineering requirements,a placement model based 0-1 integer programming was investigated. In this model,maximum observable channel constraint and zero injection were considered. Adopting the degree of bus voltage and line power flow constraints violations in the post-contingency as filtering index,the set of key contingencies can be obtained by critical line screening technique. Thus the line set of traditional N-1 checking was narrowed. Numerical simulation was respectively conducted on IEEE 14-bus,30-bus,57-bus,118-bus system,Zhejiang province power grid 500 kV(76-bus)and Zhejiang power grid 220 kV system (543-bus). Comparing with the N-1 condition (line outages),the result indicate that the proposed method reduces effectively the number of PMU configuration,and improves the reliability and economic efficiency of the system.
Key words: 0-1 integer program; phasor measurement unit(PMU); limited number of channels; line screening technique