JOURNAL OF MECHANICAL & ELECTRICAL ENGINEERING
Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Fuzzy risk evaluation method research and application in power plant boiler
Published:2015-03-11
author: CHEN Zhangqiao1, GONG Lingzhu1,2, CHEN Shiwang2,3, YANG Xiaoxiang3
Browse: 3123
Check PDF documents
Fuzzy risk evaluation method research and application in power plant boiler
CHEN Zhangqiao1, GONG Lingzhu1,2, CHEN Shiwang2,3, YANG Xiaoxiang3
(1. School of Chemical Engineering, Fuzhou University, Fuzhou 350108, China;
2. Fujian Special Equipment Inspection Institute, Fuzhou 350001, China;
3. School of Mechanical Engineering and Automation, Fuzhou University, Fuzhou 350108, China)
Abstract: Aiming at the problems of power station boiler level of risk evaluation, the fuzzy comprehensive evaluation was investigated. After the analysis of failure factors and the important degree of various influencing factors of power plant boiler, a more scientific evaluation index system of power station boiler suitable for online evaluating was established. A method was presented to combine the fuzzy comprehensive evaluation with improved fuzzy analytical hierarchy process. The weight of each factor of the index system was calculated by improved fuzzy analytical hierarchy process. The comprehensive evaluation method was applied to evaluate the influence factors of a certain power plant boiler′s practical operation condition. The fuzzy composite operator was applied to calculate assessment result. The results indicate that the level of risk assessment of the influence factors is the sixth grade, which means its failure probability is small and the power plant boiler operation condition is good.
Key words: fuzzy comprehensive evaluation; improved fuzzy analytical hierarchy process; power plant boiler; risk assessment; operation condition
-