JOURNAL OF MECHANICAL & ELECTRICAL ENGINEERING
Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
First fault function optimization and implementation in reactor protection system of CPR1000 project
Published:2015-12-10
author:SHI Hong liang, YAO Xing rui, WANG Yong xin, SUN Ming jun
Browse: 3094
Check PDF documents
First fault function optimization and implementation in reactor
protection system of CPR1000 project
SHI Hong liang, YAO Xing rui, WANG Yong xin, SUN Ming jun
(Liaoning Hongyanhe Nuclear Power Co., Ltd., Dalian 11601, China)
Abstract: Aiming at the problem that the first out function was not available in particular stage (From the reactor starting to the turbine is latched), when Hongyanhe nuclear power plant reactor in the starting progress, the design purposes,implementation scheme, judgment principles of first out function and the process of system state when the nuclear power plant is starting, were researched.Through the research about the particular stage of the reactor crew, according to the logic of reactor protection and the actual state of progress system startup, optimization scheme was proposed based on the current state of the first out functional. The results indicate that the optimization scheme can reflect the real demand of the unit when it is starting up,and solve the problem that the first out function is not available in particular stage(especially the start up of the reactor to the turbine latched),improve the availability of the first out function.
Key words: nuclear power plant; CPR100 project; first fault function; optimization
-
- Chinese Core Periodicals
-
- Chinese Sci-tech Core Periodicals
-
- SA, INSPEC Indexed
-
- CSA: T Indexed
-
- UPD:Indexed
-