Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Default value realization research of CPR1000 safety classified DCS platform
WANG Shaowei, LI Gongjie, SUN Wei, TIAN Yong
(China Nuclear Power Design Co.,Ltd.(Shenzhen), ShenZhen 518172, China)
Abstract: Aiming at the problems of the safety DCS used in CPR1000 nuclear power plants had no platform function of default value, the signal fault selfdiagnosis mechanism of MELTAC DCS platform was analyzed, signal quality transmitting management was researched, and default value switchover was established as a countermeasure to output disturbing. Meanwhile, because the risk of CPU over load, the scheme was adjusted, the default value realization location was changed from signal input cabinet to command output cabinet or NC DCS gateway. Finally, the scheme base on corporation of signal unavailable diagnosing, signal quality transmitting management and default value switchover was established. The scheme was tested and implemented in multiprojects. The results show that the default value scheme can avoid risk of CPU overload and meanwhile fulfill the requirement of default value function.
Key words: CPR1000; safety DCS; default value