Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
Design of prefabricated substation based on modular base and polyurethane composite board
WU Xingtan1, YU Huiyong1, ZHU Yi2, LI Zhongxiang1, WANG Yangyang1
(1.Xuji Group Co.,Ltd, Xuchang 461000, China; 2.Economic & Technology Reseach Institute, Key words: prefabricated substation; modular base; polyurethane composite board
State Grid Shandong Electric Power Company, Jinan 250021, China)
Abstract: Aiming at the problem of large construction quantity and uneven construction quality of the existing prefabricated substation, the equipment integration, structure layout, prefabricated cable and alignment of the prefabricated substation was studied; the comparison of prefabricated building materials polyurethane composite board and ALC was analyzed, the assembling method of polyurethane composite board was listed, the prefabricated substation was proposed, which based on modular base integrated with primary and secondary equipment and prefabricated cable, modular polyurethane composite board as enclosure structure. The design scheme and construction technology of foundation and building of prefabricated substation were given. The scheme was verified in the practical engineering application. The results indicate that this prefabricated substation can achieve the integration of switching equipment, reduce the scene and cabinet, wiring and other processes, increase by 42% in construction speed compared with conventional prefabricated substation, and avoid onsite wet operations, improve the construction quality. It can be used for reference application of prefabricated substation in the future.