Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
DONG Wei1, SHEN Jin rong1, HUI Jie1, SUN Tie tun2
(1.College of Mechanical and Electrical Engineering, Hohai University, Changzhou 213022, China;2.Changzhou EGing Photovoltaic Technology Co., Ltd., Changzhou 213213, China)
Abstract: In order to solve the problem of micro grid equipment management confusion, the life cycle management concept applied to the management of micro grid equipment. The equipment management is divided into pre management, mid term management and later management, to achieve the equipment throughout the life cycle of scientific management. At the same time, through the establishment of the equipment management database, the initial information of the micro grid equipment is recorded, and the real time status data of the micro grid equipment at each stage is monitored. The monitoring data and the existing data of the database are analyzed to construct the fault early warning of the micro grid equipment model, determine whether the equipment is normal, timely processing the equipment which needs repair or maintenance. On the other hand, the monitoring data can help analyze the micro grid power generation efficiency, achieve real time monitoring and effective management of micro grid equipment. The results indicate that the micro grid equipment management system improve the reliability of micro grid operation.
Key words: life cycle; microgrid; equipment management; fault early warning