Founded in 1971 >
Chinese Sci-tech Core Periodicals >
British Science Abstracts (SA, INSPEC) Indexed Journals >
United States, Cambridge Scientific Abstract: Technology (CSA: T) Indexed Journals >
United States, Ulrich's Periodicals Directory(UPD)Indexed Journals >
United States, Cambridge Scientific Abstract: Natural Science (CSA: NS) Indexed Journals >
Poland ,Index of Copernicus(IC) Indexed Journals >
International Standard Serial Number:
ISSN 1001-4551
Sponsor:
Zhejiang University;
Zhejiang Machinery and Electrical Group
Edited by:
Editorial of Journal of Mechanical & Electrical Engineering
Chief Editor:
ZHAO Qun
Vice Chief Editor:
TANG ren-zhong,
LUO Xiang-yang
Tel:
86-571-87041360,87239525
Fax:
86-571-87239571
Add:
No.9 Gaoguannong,Daxue Road,Hangzhou,China
P.C:
310009
E-mail:
meem_contribute@163.com
ZHAO Guizhi1, LIU Yarong2
(1.College of Mechanical Engineering, Inner Mongolia University for the Nationalities, Tongliao 028043,China;2.College of Engineering ,Changchun Vocational Institute of Technology, Changchun 130000,China)
Abstract: In order to solve the problem that emergency event scheduling in agricultural machinery steering gear workshop was not timely, the related problems of workshop scheduling were studied, and a workshop scheduling model based on improved immune clonal algorithm was proposed. Firstly, combined with the actual production of agricultural steering gear, the objective function was constructed with the maximal completion time, equipment energy consumption and equipment load. Then, multistrategy population initialization and adaptive mutation operator were used to improve the immune cloning algorithm. Finally, on the basis of analyzing the data of workshop scheduling processing time and energy consumption, taking the fitness of the scheduling model and Gantt chart as indicators, the scheduling effect of the model was validated. The results show that compared with the traditional immune clone algorithm, the improved immune clone algorithm has faster optimization speed and higher optimization accuracy, and can realize fast dynamic scheduling of agricultural machinery steering workshop.
Key words: steering gear; manufacturing workshop; dynamic scheduling; immune clonal algorithm