International Standard Serial Number:

ISSN 1001-4551

Sponsor:

Zhejiang University;

Zhejiang Machinery and Electrical Group

Edited by:

Editorial of Journal of Mechanical & Electrical Engineering

Chief Editor:

ZHAO Qun

Vice Chief Editor:

TANG ren-zhong,

LUO Xiang-yang

Tel:

86-571-87041360,87239525

Fax:

86-571-87239571

Add:

No.9 Gaoguannong,Daxue Road,Hangzhou,China

P.C:

310009

E-mail:

meem_contribute@163.com

Research on disassembly hierarchy model and its construction method for complex products
Published:2020-05-20 author:GUO Lei1, ZHANG Xiu-fen1, TIAN Yong-ting1, YU Gang2 Browse: 2162 Check PDF documents
Research on disassembly hierarchy model and its construction method for complex products
GUO Lei1, ZHANG Xiu-fen1, TIAN Yong-ting1, YU Gang2
(1.College of Mechanical Engineering, Inner Mongolia University of Technology,
Hohhot 010051, China; 2.Teaching and Learning Department,Inner Mongolia
Electromechanical Vocational and Technical College, Hohhot 010070, China)
Abstract: Aiming at the complexity of the disassembly information model and the difficulty of its construction in the current complex product disassembly sequence planning process, the constraint meaning, meaning of expression and construction method of the disassembly information model were studied. On the basis of the synchronous release of geometric constraint relationship of disassembly components, a disassembly hierarchy model and its construction method was proposed. A disassembly hierarchy model was defined to describe the constraint information such as contact, space constraints, and disassembly priority between components. The acquisition method of the sub-disassembly body was proposed. Furthermore, the sub-disassembly body was obtained by decomposing the disassembly tasks of complex product layer by layer. Thus, the initial disassembly hierarchical model was constructed after all of the sub-disassembly bodies were obtained. In order to remove the redundant information in the initial disassembly hierarchical model, the disassembly constraint simplification rules were given, and the disassembly hierarchical model was formed after simplification. Finally, the feasibility of the proposed model and construction method was verified by an engine case. The results indicate that the modeling efficiency is increased by employing the characteristics of modular design of complex products, which provides a support for solving the automation disassembly problem of complex products by computer.
Key words: disassembly; disassembly sequence planning; simplification; hierarchical model; disassembly task
  • Chinese Core Periodicals
  • Chinese Sci-tech Core Periodicals
  • SA, INSPEC Indexed
  • CSA: T Indexed
  • UPD:Indexed


2010 Zhejiang Information Institute of Mechinery Industry

Technical Support:Hangzhou Bory science and technology

You are 1895221 visit this site